♦Stainless steel $304/S316, longer service life
♦ABS aluminum alloy structure is stronger and more durable
♦Stable and reliable performance, not easily affected by viscous liquids
♦Can be used in high temperature and high pressure environments
♦A variety of materials and connection methods to meet the needs of different environments
♦It can be installed horizontally on the side wall of the tank or vertically on the top of the tank.
Item No :
SCH-FLSOrder(MOQ) :
5Payment :
T/TProduct Origin :
ChinaSCH-FLS Stainless Steel Level Controller SwitchStainless Steel Level Controller Switch
The series of side mounted floating ball liquid level switch is based on the liquid buoyancy principle. When the floating ball moves up and down due to the buoyancy, the magnetic spring switch in the junction box is affected by the arm end magnet, and the "no" and "NC" contacts are exchanged. The same principle is applied to the microswitch device. The magnet in front of the microswitch and the magnet at the arm end push the microswitch, resulting in "no" and "NC" actions.
Technical Specification
Parameters---Float Ball Level Switch | |||
Control region | 8mm | 25-550mm | 8-1000mm |
agent gravity | ≥0.8g/cm | ≥0.8g/cm | ≥0.8g/cm |
Adjustment | non adjustment | adjustment | non adjustment |
temprature | -40~+80°C | -40~+80°C | -40~+80°C |
environment temperature | -20~+80°C | -20~+80°C | -20~+80°C |
working pressure | ≤1.0MPa | ≤1.0MPa | ≤1.0MPa |
precision | ±20mm | ±20mm | ±20mm |
contactor capacity | 220/380V AC 1A | 220/380V AC 1A | 220/380V AC 1A |
agent viscoity | ≤0.02Pa.s | ≤0.02Pa.s | ≤0.02Pa.s |
top and bottom blind zone | 100mm | 100mm | 100mm |
Material | stainless steel mateiral | stainless steel mateiral | stainless steel mateiral |
connection | flange connection | flange connection | flange connection |
Installation | side mounted | side mounted | top mounted |
Product Display
FAQ
Can you produce according to the samples or drawings?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
What is the lead time?
For standard models, lead time is about 3~5 days after order confirmed and payment received.
For OEM orders, the delivery is about 2~3 weeks after data confirmed and payment received.
How to solve the quality problems after sales?
Take photos or videos of the problems and send to us.
We will make a satisfied solution for you within 24 hours after we confirm the problems.